高清一级做a爱过程免费视频/素人面接/亚洲欧美日韩在线综合福利/农村寡妇特一级毛片 - 无国产精品白浆免费视

National testing and certification one-stop service hotline:15013801663
|
Home > Services

Introduction to Turkey TSE Certification

  • Time:2018-04-17
  • Viewing count:1541
TSE certification
Mandatory
Country area: Turkey
Conformity Assessment Body: Turkish Standards Institute (TSE)
In addition to the CE mark, the Turkish government also publishes a “List of Imported Mandatory Standards” each year, mainly for food, industrial equipment, vehicles, fire-fighting products and textiles.
For products not covered by the EU Directive and products that are not covered by the EU Directive but are still included in the Turkish national mandatory standards, they must be tested in accordance with the Turkish mandatory standards before importation and TSE certification before passing the Customs. Enter the Turkish market for sale.
Turkey TSE certification scope
Household appliances: household gas cookers, elevator construction and installation safety, domestic water heaters, woks, frying pans, electric cups, small pans, load-bearing resistors, fluorescent lamps, etc.
Construction supplies: wood preservatives, rubber, load-bearing wooden frame glue, wooden instrument panels, radiators, fireproof clothing, anti-high fuses, radiators and convection heaters, fiberboard, plastic piping, resilience flooring , architectural glass, fire hose, geometric aggregate props, durability of wooden products, thick insoluble products, concrete, plaster and cement mixture, chemical and gas resistant coatings, pigments and varnishes, adhesives, Welding, ceramic tiles, etc.
Medical products: oxygen-absorbing equipment, sound-insulating devices, respirators, sterilizers and biological systems for disinfection processes, packaging materials systems for sterilizing instruments, sphygmomanometers, dental appliances, sterile catheters, biological properties of medical devices Evaluation, crutches, etc.
Mechanical supplies: flanges, copper and copper alloys, underground coal mine riot equipment, trolleys, valves, gears, mechanical safety equipment, construction bearings, industrial process control valves, woodworking machinery, pressure-controlled flow devices, escalators and passenger conveyors, Light liquids such as oil and gasoline separators, soot and heat control systems, conveyor belts, etc.
Other products: fire detection and fire alarm systems, toy safety equipment, textiles, gas tank multi-function controls, hot water pipes, drainage and sewer pipes, gardening tools, mobile waste bins, portable gas tanks, fresh fruits and vegetables, leather Footwear manufacturing machinery, food, drinking water treatment chemicals, sports equipment, children's products, gasoline fuel, aviation supplies, photography, water quality, natural gas, glass containers, etc.
Turkey TSE certification process
(1) TSE inspection
a) The Ministry of Industry and Trade of Turkey authorizes the TSE of the Turkish Bureau of Standards to conduct inspections on the conformity of products requiring the CE mark before customs clearance and issue a confirmation letter.
b) According to the Turkish Foreign Trade Standardization Official Gazette No. 2005/1, products that fall within the scope of Turkish mandatory standards must be certified by the Turkish Bureau of Standards (TSE) to obtain a certificate. If the importer claims that its products comply with the relevant international standards (ISO, CEN, IEC, CENELEC, ETSI), the inspection may be carried out in accordance with international standards as required, otherwise it will be tested according to Turkish mandatory standards. The importer submits the TSE certificate to the customs, which can be confirmed by the customs.
(2) TSE certification procedure
1) The applicant fills in the application form in accordance with the requirements of the TSE;
2) The application is evaluated by the TSE to determine whether to accept the application;
3) An inspection team is assigned by the TSE;
4) The TSE coordinates with the applicant to determine the date of inspection, the inspection process, the trigger plan, and the accommodation arrangements when necessary;
5) The inspection team will inspect the equipment, production equipment, personnel and quality system at the place of production;
6) If the inspection result is acceptable, the inspector will sample from the finished product;
7) Samples will be inspected and tested in accordance with the appropriate standards in qualified laboratories;
8) If the product has a CB certificate and report or a CCA NTR certificate and report, it is not required to be tested and a comparative evaluation is required;
9) The inspection report issued by the inspection team and the test report or evaluation report issued by the laboratory shall be submitted to the certification committee for verification by the certification department, and finally decided by the certification committee;
10) If the certification committee decides to authorize the use of the TSE mark, the application company and the TSE must sign a license contract and issue a certificate.
(3) Fill in the application form
Should be filled out by the applicant;
If the application form is completed by an authorized representative of the applicant organization, the authorized representative must submit an official document proving that it is authorized by the applicant organization;
The application form filled out by the applicant must be for one product or one product category and one place of production;
If the product does not have only one place of production, each production site needs to fill out an application form separately;
Products with the same characteristics that are produced in the same production location but have different trademarks can be specified in the same application form, at which point the manufacturer must provide a declaration of conformity for each trademark.
prompt:
a. The application form and its attachments must be legible. Please forward them to or send them to the TSE Certification Department by registered mail, shipping or shipping. The address can be obtained from the TSE website;
b. The authorized signature on behalf of the applicant also indicates that the information on the form is correct (please confirm the correctness of the information before signing), and the wrong information or misleading information is the responsibility of the applicant organization;
c. The application form must be in Turkish or English. If the documents are not in the two languages, they should be translated into Turkish by the consulate of the applicant country or a legally recognized translator in Turkey. The translated manuscript and the manuscript will be submitted together.
(4) Administrative additional documents
a. Official document indicating the legal status of the applicant
An application outside Turkey requires an official document confirmed by the Turkish embassy or consulate in the country where the name, address, scope of activity, representative of the institution and contract authorizer are indicated.
b. The signature book of the applicant's authorized person
If it is a foreign application from Turkey, it must be confirmed by the Turkish embassy or consulate.
c. Trademark registration certificate
The certificate must be issued by the Turkish Patent Office or the protection of the trademark in Turkey must be confirmed by the Patent Office. but:
- If the trademark of the product has not been protected in Turkey, a document indicating that the application has been filed with the Patent Office may be temporarily accepted (the maximum period of provision may be up to 18 months);
If the application is abroad, the document must be confirmed by the Turkish embassy or consulate;
If the ownership of the registered trademark does not belong to the applicant, the written owner shall issue a written permission (or agreement).
The applicant is allowed to use the trademark, which must be submitted with the trademark registration certificate, which must be verified by a notary public.
d. For foreign applications, the contract documents indicating the agreement between the applicant and the producer shall be confirmed by the Turkish Embassy or Consulate.
e. A registration certificate granted by a designated chamber of commerce.
f. Advance payment receipt (a copy can be submitted).
(5) Advance payment
If the production site inspection is carried out in Turkey, the advance payment is at least 500 000 000 TL;
If the production site inspection is carried out outside Turkey, the prepayment amount is 10,000 Euros; however, if more than one production plant is applied, an additional 2,500 Euros will be charged for each additional location;
These advances will be deposited in one of the TSE Finance Offices or one of the TSE's bank accounts;
For foreign factory inspections, the inspection team requires a service fee of 350 Euro per person per day;
The cost of factory inspections includes service fees plus travel, accommodation and living expenses;
The cost of the entire certification is the factory inspection fee, product testing fee and certificate fee;
In addition, an institution that is eligible for a certificate is required to pay a performance bond of 2,000,000 000 000 TL for each certified product, which can be paid in cash or a bank guarantee letter without a time limit.
(6) Additional technical documents to be submitted
For electrical products, the CIG 22-Section B form should be completed and submitted with the application form;
For non-electrical products, fill out the FR-39-Section B form and submit it together with the application form;
Product Category;
Technical drawings/sketches of the product (if applicable);
Color photographs of the product (appearance, internal details of the product in its natural state), including the state of the electronic environment if necessary (if applicable);
Identification/label sample (must be easily identifiable);
The pattern or photo of the registered trademark that the product will use.
(7) Documents submitted at the time of holding the CCA-NTR certificate and report application:
a. The CIG 22-Section B form is submitted with the application form;
. B If a copy of the filled out by CCA members CIG 23 tables, for lighting products, please add ENEC accessories;
c. CCA Test Result Announcement (NTR) or test result statement. TR) and a complete test report form;
d. Test reports including country differences (if applicable);
e. A list of electronic components, including reference model/name (listing which NCBs are certified);
f. The nameplate or pattern indicates the information required by the relevant EN standard, the certification mark and the country of origin name/code;
g. Technical drawings, circuit diagrams (if applicable);
h. Operation manual (if applicable);
i. Product photo or brochure (if applicable);
j. A sample (with the number of Test Result Announcement (NTR) or Test Result Statement (STR) issued by the CCA member body);
k. the pattern or photograph of the registered trademark that the product will use;
l. The product/equipment submitted differs from the sample previously tested at the NCB (if applicable, the name of the NCB can be written).
(8) Additional technical information to be submitted for applications holding CB certificates and reports
a. Complete the CIG 22-Section B form and submit it together with the application form;
b. CB certificate and complete CB report;
c. Test reports including country differences (if applicable);
d. A list of electronic components, including reference model/name (listing which NCBs are certified);
e. The nameplate or pattern indicates the information required by the relevant EN standard, the certification mark and the country of origin name/code;
f. technical drawings, circuit diagrams (if applicable);
g. Operation manual (if applicable);
h. Product photos or brochures (if applicable);
i. A sample (identified by the number of the CB certificate issued by Body A);
j. The pattern or photograph of the registered trademark that the product will use;
k. The product/equipment submitted differs from the sample previously tested at the NCB (if applicable, the name of the NCB can be written).
Fill in the application form
● Should be filled out by the applicant;
● If the application form is completed by an authorized representative of the applicant organization, the authorized representative must submit an official document to prove his or her identity as authorized by the applicant organization;
● The application form filled out by the applicant must be for one product or one product category and one production site;
● If the product does not have only one production site, each production site needs to fill out an application form separately;
● When the products have the same characteristics and are produced in the same production site but have different trademarks, they can be specified in the same application form. At this time, the manufacturer must provide a declaration of conformity for each trademark.
prompt:
a. The application form and its attachments must be legible. Please forward them to or send them to the TSE Certification Department by registered mail, shipping or shipping. The address can be obtained from the TSE website;
b. The authorized signature on behalf of the applicant also indicates that the information on the form is correct (please confirm the correctness of the information before signing), and the wrong information or misleading information is the responsibility of the applicant organization;
c. The application form must be in Turkish or English. If the documents are not in the two languages, they should be translated into Turkish by the consulate of the applicant country or a legally recognized translator in Turkey. The translated manuscript and the manuscript will be submitted together.

Administrative add-on file

a. Official document indicating the legal status of the applicant
An application outside Turkey requires an official document confirmed by the Turkish embassy or consulate in the country where the name, address, scope of activity, representative of the institution and contract authorizer are indicated.
b. The signature book of the applicant's authorized person
If it is a foreign application from Turkey, it must be confirmed by the Turkish embassy or consulate.
c. Trademark registration certificate
The certificate must be issued by the Turkish Patent Office or the protection of the trademark in Turkey must be confirmed by the Patent Office. but:
- If the trademark of the product has not been protected in Turkey, a document indicating that the application has been filed with the Patent Office may be temporarily accepted (the maximum period of provision may be up to 18 months);
If the application is abroad, the document must be confirmed by the Turkish embassy or consulate;
If the ownership of the registered trademark does not belong to the applicant, the written owner shall issue a written permission (or agreement).
The applicant is allowed to use the trademark, which must be submitted with the trademark registration certificate, which must be verified by a notary public.
d. For foreign applications, the contract documents indicating the agreement between the applicant and the producer shall be confirmed by the Turkish Embassy or Consulate.
e. A registration certificate granted by a designated chamber of commerce.
f. Advance payment receipt (a copy can be submitted).
Prepayment fee
If the production site inspection is carried out in Turkey, the advance payment is at least 500 000 000 TL;
If the production site inspection is carried out outside Turkey, the prepayment amount is 10,000 Euros; however, if more than one production plant is applied, an additional 2,500 Euros will be charged for each additional location;
These advances will be deposited in one of the TSE Finance Offices or one of the TSE's bank accounts;
For foreign factory inspections, the inspection team requires a service fee of 350 Euro per person per day;
The cost of factory inspections includes service fees plus travel, accommodation and living expenses;
The cost of the entire certification is the factory inspection fee, product testing fee and certificate fee;
In addition, an institution that is eligible for a certificate is required to pay a performance bond of 2,000,000 000 000 TL for each certified product, which can be paid in cash or a bank guarantee letter without a time limit.
Submit additional technical documents
For electrical products, the CIG 22-Section B form should be completed and submitted with the application form;
For non-electrical products, fill out the FR-39-Section B form and submit it together with the application form;
Product Category;
Technical drawings/sketches of the product (if applicable);
Color photographs of the product (appearance, internal details of the product in its natural state), including the state of the electronic environment if necessary (if applicable);
Identification/label sample (must be easily identifiable);
The pattern or photo of the registered trademark that the product will use.
Documents submitted at the time of holding the CCA-NTR certificate and report application:
a. The CIG 22-Section B form is submitted with the application form;
. B If a copy of the filled out by CCA members CIG 23 tables, for lighting products, please add ENEC accessories;
c. CCA Test Result Announcement (NTR) or test result statement. TR) and a complete test report form;

Previous:No more!

Next:No more!